4 Questions


Total of 4 questions focus on Project Management in Aviation/Aerospace + Airport Operations and Management

What Went Wrong with the A380?
The development of the Airbus A380 was a very large project and involved many countries. Obviously, the A380 project planning phase was a daunting task to say the least. Of all that could have gone wrong, it is interesting to note the planning phase did not account for the possible impact of cultural differences among the participating countries. The result of this was an additional project cost of $6 billion and a two-year delay. Read the article below and write an entry providing your thoughts on possible causes of this project planning oversight. Beyond Software: https://blog.beyondsoftware.com/failed-project-series-what-went-wrong-with-a380

Work Breakdown Structure
Planning a project includes many important processes. One is developing a work breakdown structure (WBS). Refer to attached textbook Chapter 10 and watch the video https://youtu.be/CRpaIiA3PIc to learn about project WBS uses. Develop a two-page document, excluding the cover sheet and reference page, which describes how a WBS is developed and its many uses, in particular, for budget planning by a typical aerospace/aviation project manager.
All written assignments are to be prepared as scholarly documents in accordance with the current edition of the APA Manual, and will be automatically evaluated through Turnitin. Additional research and inquiry is encouraged as well as original thought and critical thinking.

Airport Self-Inspections
Do you have a firm grasp on the importance of airport self-inspection programs? Research and describe the benefits of a strong airport self-inspection program as outlined in 14 CFR Part 139. How can technology and/or the incorporation of SMS assist with this issue?

Airport Operational and Safety Review
Is your airport safe? Is it prepared for the future? As an airport director, you should know the answers to these questions. Review your selected airport’s operational and safety procedures to determine if they are adequate for both current and future challenges. Items such as runway, taxiway, parking aprons, air traffic control, 14 CFR Part 139, and Safety Management System protocols should be reviewed. Describe at least three issues that you feel need to be updated and/or changed in a 3-5 page essay.
All written assignments are to be prepared as scholarly documents in accordance with the current edition of the APA Manual, and will be automatically evaluated through Turnitin. Additional research and inquiry is encouraged as well as original thought and critical thinking.