Individual Project: WBS

Individual Project: WBS
Manage Your Health (cont.)
Assignment Instructions:
1. Develop a work breakdown structure (WBS) for the project. Break down the work to Level 3 or Level 4, as appropriate. Use the MS Word template WBS Template provided as a guides. NOTE: Be sure the WBS is based on the project charter (created for the Individual Project: Charter assignment).
2. Use the WBS you developed using the WBS Template to create your WBS in MS Project. Make sure the Gantt chart is displayed within the MS Project. Durations and dependencies can be used. Be sure to go into depth with your project plan. Task-level details should include resources, owners, time estimations, and cost estimations, etc. Financial analysis should include calculations like NPV or similar methodology.
Two files will be submitted!!
1. WBS Word Document Outline Template
2. WBS MS Project Document containing both the WBS and Gantt Chart