I have attached the PowerPoint slides, please review it and create the below documents. You can either use Gantt chart or excel.
The Gantt chart or Excel will contain all the activities
The elements of the project charter you must prepare and submit are:
- Work breakdown structure
- An AON network
- The critical path
- An activity list, early-start schedule, slack list, and master schedule
- Labor requirements
- Cash flow requirements
The “D.U. Singer Hospital Products Corp.” case is found in the text on pp. 370-374.
Reference :
Meredith, J. R., & Shafer, S. M. (2012). Operations management for MBAs (7th). Hoboken, NJ: John Wiley & Sons.