CMG301 Fundamentals of Contract Management Case 2 Assignment Figure 4.1 in the Turner (2003) text provides a list of items a contract should include. This contract is missing key elements of a sta


CMG301 Fundamentals of Contract Management  

Case 2 Assignment 

Figure 4.1 in the Turner (2003) text provides a list of items a contract should include. 

This contract is missing key elements of a standard contract. Your case assignment response should discuss the four parts (below), and in a 3-page paper, provide the following:

  • List the key elements of a contract from Turner (2003).
  • Identify the missing elements of the contract link above.
  • For each missing element, explain the potential ramifications or impact to each party.
  • For each missing element, give an example of wording that would complete the requirements of a standard contract.

References

Turner, J. R. (2003). Contracting for project management. Gower Publishing Limited. ISBN: 0566085291. Available in the Trident Online Library. 

Please see attached assignment details.