CMG301 Fundamentals of Contract Management
Case 2 Assignment
Figure 4.1 in the Turner (2003) text provides a list of items a contract should include.
This contract is missing key elements of a standard contract. Your case assignment response should discuss the four parts (below), and in a 3-page paper, provide the following:
- List the key elements of a contract from Turner (2003).
- Identify the missing elements of the contract link above.
- For each missing element, explain the potential ramifications or impact to each party.
- For each missing element, give an example of wording that would complete the requirements of a standard contract.
References
Turner, J. R. (2003). Contracting for project management. Gower Publishing Limited. ISBN: 0566085291. Available in the Trident Online Library.