Assigned Readings:Chapter 9: Scope PlanningChapter 10: Project Schedule PlanningInitial Postings: Read and reflect on the assigned readings for the week. Then post what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding in each assigned textbook chapter.Your initial post should be based upon the assigned reading for the week, so the textbook should be a source listed in your reference section and cited within the body of the text. Other sources are not required but feel free to use them if they aid in your discussion.Also, provide a graduate-level response to each of the following questions:
- Go online and research the difference between total slack and free slack.
- Prepare proper reference citations for the sites you located, using APA style.
- Write definitions of total slack and free slack in your own words.
- Why would the distinction between different forms of slack be important to a project manager?
- How does scope management differ from scope control?
[Your post must be substantive and demonstrate insight gained from the course material. Postings must be in the student’s own words – do not provide quotes!] [Your initial post should be at least 450+ words and in APA format (including Times New Roman with font size 12 and double spaced). Post the actual body of your paper in the discussion thread then attach a Word version of the paper for APA review]
Text-
Title: Project Management
Subtitle: https://opentextbc.ca/projectmanagement/
ISBN: 978-1-77420-013-1
Authors: Adrienne Watt
Publisher: BCcampus
Publication Date: August 14, 2014
Edition: 2nd Edition