Work Breakdown Structure (WBS) and Gantt Charts
Among the many details of a project are the required tasks and schedule. Every project, of course, needs a schedule, but the project team first needs to define the specific work tasks required to complete the project. A key tool for this process is the work breakdown structure, or WBS.
The WBS
A WBS is a graphic decomposition of the individual tasks required for the project to be completed. Depending on the complexity of the project, the WBS may be fairly general or very detailed. Each box in a WBS chart will represent a work package, which is the lowest group of tasks that can be managed, analyzed, and controlled in terms of time and cost.
The readings below will provide more detail and include a simple example for finding a new home. This project might be separated into several sets of taskswork packagessuch as the following:
- choose location
- select a new home
- sell current home
- occupy new home
Some or all of those work packages might be further divisible, depending on the level of effort required for such tasks. For example, there are many subtasks required to selecting a new home, such as finding a real estate agent and determining the type of home to purchase. Subtasks usually have an order in which they must be completed. For instance, you would not be able to make an offer before you were determined prequalified for a .
Preparing the Work Breakdown Structure
By Merrie Barron and Andrew R. Barron
After the deliverables and requirements are defined, the process of breaking down the work of the project using a work breakdown structure (WBS) begins.
The WBS defines the scope of the project and breaks the work down into components that can be scheduled, estimated, and easily monitored and controlled. The idea behind the WBS is simple. You subdivide a complicated task into smaller tasks, until you reach a level that cannot be further subdivided. Anyone familiar with the arrangements of folders and files in a computer memory, or who has researched their ancestral family tree, should be familiar with this idea.
A Work Breakdown Structure (WBS) for Cleaning a Room
You stop breaking down the work when you reach a low enough level to perform an estimate of the desired accuracy. At that point, it is usually easier to estimate how long the small task will take and how much it will cost to perform than it would have been to estimate these factors at the higher levels. Each descending level of the WBS represents an increased level of detailed definition of the project work.
As an example, if I want to clean a room, I might begin by picking up clothes, toys, and other things that have been dropped on the floor. I could use a vacuum cleaner to get dirt out of the carpet. I might take down the curtains and take them to the cleaners, then dust the furniture. All of these tasks are subtasks performed to clean the room. As for vacuuming the room, I might have to get the vacuum cleaner out of the closet, connect the hose, empty the bag, and put the machine back in the closet. These are smaller tasks to be performed in accomplishing the subtask called vacuuming. The diagram below shows how these tasks might be portrayed in WBS format.
Outline Format of a Work Breakdown Structure (WBS)
It is important to note that we do not worry about the sequence in which the work is performed or any dependencies between tasks when we do a WBS. That will be worked out when we develop the schedule. For example, under 3.0 Vacuum in the diagram, it would be obvious that “3.2 Vacuum carpet” would be performed after “3.4 Connect hose and plug”! However, you will probably find yourself thinking sequentially, as it seems to be human nature to do so. The main idea of creating a WBS is to capture all of the tasks, irrespective of their order. So if you find yourself and other members of your team thinking sequentially, dont be concerned, but dont get hung up on trying to diagram the sequence, or you will slow down the process of task identification.
A WBS can be structured any way it makes sense to you and your project. In practice, the chart structure is used quite often (as in the example in the diagram), but a WBS can be composed in outline form as well.
Work Breakdown Structure (WBS) Based on Project Deliverable
Youll notice that each element at each level of the WBS (in the diagram or outline form) is assigned a unique identifier. This unique identifier is typically a number, and its used to sum and track costs, schedules, and resources associated with WBS elements. These numbers are usually associated with the corporations chart of accounts, which is used to track costs by category. Collectively, these numeric identifiers are known as the code of accounts.
Work Breakdown Structure (WBS) Based on Project Phase
There are also many ways you can organize the WBS. For example, it can be organized by deliverable or phase. In one example, the major deliverables of the project are used as the first level in the WBS. For example, if you are doing a multimedia project, the deliverables might include producing a book, CD, and a DVD.
Many projects are structured or organized by project phases. Each phase represents the first level of the WBS, and the deliverables of that phase would comprise the next level, and so on.
As mentioned earlier, the project manager is free to determine the number of levels in the WBS based on the complexity of the project. You need to include enough levels to accurately estimate project time and costs, but not so many levels that it becomes difficult to distinguish between components. Regardless of the number of levels in a WBS, the lowest level in a WBS is called a work package.
Work packages are the components that can be easily assigned to one person, or team of people, with clear accountability and responsibility for completing the assignment. The work package level is where time estimates, cost estimates, and resource estimates are determined.
Project Statement of Work
By Adrienne Watt and bpayne
The statement of work (SOW), sometimes called the scope of work, is a definition of a projects parametersfactors that define a system and determine its behaviorand describes the work done within the boundaries of the project, and the work that is outside the project boundaries.
The SOW is typically a written document that defines what work will be accomplished by the end of the projectthe deliverables of the project. The project scope defines what will be done, and the project management plan defines how the work will be accomplished.
No template works for all projects. Some projects have a detailed scope of work, and some have a short summary document. The quality of the scope is measured by the ability of the project manager and project stakeholders to develop and maintain a common understanding of the products or services the project will deliver.
The size and detail of the project scope is related to the complexity profile of the project. A more complex project often requires a more detailed and comprehensive scope document.
According to the Project Management Institute (2008), the scope statement should include the following components:
- description of the scope
- product acceptance criteria
- project deliverables
- project exclusions
- project constraints
- project assumptions
The scope document is the basis for agreement by all parties. A clear project scope document is also critical to managing change on a project. Since the project scope reflects what work will be accomplished on the project, any change in expectations that is not captured and documented creates an opportunity for confusion.
One of the most common trends in project management is the incremental expansion in the project scope. This trend is labeled scope creep. Scope creep threatens the success of a project because the small increases in scope require additional resources that were not in the plan.
Increasing the scope of the project is a common occurrence, and adjustments are made to the project budget and schedule to for these changes. Scope creep occurs when these changes are not recognized or not managed. The ability of a project manager to identify potential changes is often related to the quality of the scope documents.
References
Project Management Institute, Inc. (2008). A guide to the project management body of knowledge (PMBOK guide) (4th ed.). Project Management Institute, Inc.