Project Scheduling, Resource Management, Project Budget

  

Assigned Readings:

Chapter 9. Project Scheduling

Chapter 10. Resource Management

Chapter 11. Project Budget

Initial Postings: Read and reflect on the assigned readings for the week. Then post what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding in each assigned textbook chapter.Your initial post should be based upon the assigned reading for the week, so the textbook should be a source listed in your reference section and cited within the body of the text. Other sources are not required but feel free to use them if they aid in your discussion.

Also, provide a graduate-level response to each of the following questions:

  1. Is it possible for a project team to achieve high efficiency      without scheduling tasks and activities? Discuss.
  2. Why is the impact of scheduling and resource allocation      generally more significant in multiproject organizations? How do large      fluctuations in demand affect the situation?
  3. Assume that you are in charge of developing your states      department of transportation budget. Write specific instructions for      project managers in your department to facilitate a bottom-up budgeting      process.

[Your post must be substantive and demonstrate insight gained from the course material. Postings must be in the student’s own words – do not provide quotes!]

[Your initial post should be at least 450+ words and in APA format (including Times New Roman with font size 12 and double spaced). Post the actual body of your paper in the discussion thread then attach a Word version of the paper for APA review]